Interior hand rail
Well the ice cubes are in, thanks to epoxy in a tube (Thixo from Jamestown) I plan to follow the deck holes into the ice cubes half way then finish off the bore from the inside to place the hole in the center of the cubes. Three inch ss screws from the inside to the teak hand rails on the deck, then attach oak rails on the inside with two screws to each cube. Make sense? Any suggestions at this point?
The pan build up is done, just need to gel coat. Instead of the tabs from the dreaded steel beam which is for sale, I'm going to lace the pan to the 3/4" plywood bulk head, screws going down into the new wooden beam then screwed to the newly built flange on the pan to the plywood. I should be back on the water by the Hillary's second term should the world still be spinning.
Comments and suggestions would be appreciated.
Allan